2021 Paving Project

Crews repaving streets

For Questions or Assistance

Lancaster Department of Transportation

(740) 687-6668

ldot@ci.lancaster.oh.us

Lancaster Engineering Department

(740) 687-6614

cityengineers@ci.lancaster.oh.us

BACKGROUND

This is the eighth year of a ten-year paving program funded by a property tax levy.

The 2021 Street Improvement Program – Paving, includes the asphalt milling and resurfacing of the 3 miles of local streets including incidental curb and sidewalk replacement.

​Selected streets for 2021 include

​Oakwood Ave (E. Wheeling to Frederick St)
​King St (N. High to N. Maple)
​Mt. Pleasant (E. Sixth to E. Fair)
​Ohio Ave (Cedar Hill Rd to W. Sixth Ave)
​W. Sixth Ave (N. Shoshone Dr to N. Ohio Ave)
​Union St (Alameda Ct to West Mulberry)
​Fredrick St (Sheridan Dr to Clayton Dr)
​E. Fair Ave (Sheridan Dr to End)
​Alameda Ct (Shoshone Dr to End)
​Shawnee Dr (Cedar Hill Rd to Union St)

​Alternates (As funds allow)
​Huffer Ave (Sheridan Dr to James Rd)
​Kerr Ave (Sheridan Dr to Clayton Dr)
​Clayton Dr (Frederick St to Lynn Dr)
​Lynn Dr (Grandstaff Ave to Clayton Dr)
​Medill Ave (E. Sixth Ave to E. Fair Ave)

For a map of the Streets that have received 3 Mil Levy Funds since 2014 - Click Here